WELL ENGINEERING / WELL P&A
-
• Drilling and Completion Program Development
• Workover / Sidetrack Program Development
• Well Site Management (WSM) & Field Supervision
• Anti-Collision Planning
• Rig Selection, Sourcing & Procurement
• Rig Inspection, Repair & Maintenance
• Well Site Layout including Crane Review
• Risk Assessment & Hazard Review
• CalGEM Permitting & Compliance
• BSEE Permitting & Compliance
• Injection Well Permitting
• Wellbore Diagramming
-
• Well Plugging & Abandonment Engineering, Procedures
• Well Site Management (WSM) & Field Supervision
• CalGEM Permitting & Compliance
• BSEE Permitting & Compliance
• Idle Well Management Plan Preparation & Program Management
• Rig Selection, Sourcing & Procurement
• Risk Assessment & Hazard Review
• Wellbore Diagramming
• Well History Review & Evaluation of Historic P&As
-
• Reserve Analysis / Modeling / Reporting
• Production Forecasting
• Economic Analysis / Risk Analysis
• Integrated Asset Models (Integrated Reservoir / Production / Pipeline Models)
• Gasflood / Waterflood Analysis / Optimization
• Enhanced Oil Recovery Design / Analysis
• Field Rehabilitation / Redevelopment
• Conventional / Unconventional / HPHT / Offshore / Onshore Reservoirs
• Hydraulic Fracture Design / Analysis
• Exploration Well / Development Well Planning
• Decline Curve Analysis
• Recovery Factor Analysis
• Lease Acquisition / Due Diligence
• Reservoir Suitability Analysis for Gas Flood / Carbon Capture & Sequestration
• Expert Witness / SME / Mentoring
• Teaching (Industry and College courses)
o Introduction to the Oil Industry
o Decline Curve Analysis
o Type Curve Generation for Project Evaluation
o Well Test Analysis
o Log Analysis
Engineering through Execution
Our comprehensive well engineering services include drilling & completions engineering, reservoir analysis, rig selection and sourcing, site layout, permitting, and field supervision.
Featured Project
Well Plugging & Abandonment Planning
In preparation for a 70-well offshore P&A campaign, Beacon West performed a comprehensive review of available well records and developed a program for monitoring annulus pressures while preparing procedures for well plugging and abandonment.