PROJECTS
Santa Clara Unit Asset Management
Beacon West operates and maintains Platforms Gail and Grace, the Casitas Pier, the Carpinteria onshore plant, and associated pipelines as the assets are prepared for decommissioning.
South Ellwood Field Operations Management
Beacon West was selected by the California State Lands Commission to operate and maintain Platform Holly, the Ellwood Onshore Facility, and associated infrastructure.
Carpinteria Offshore Field Maintenance & Monitoring
Beacon West monitors and maintains ConocoPhillip Platforms Hogan and Houchin and the associated infrastructure.
PRC 421 Pier & Caisson Decommissioning
Beacon West is managing the removal of two 1930s vintage piers and caissons from the surf zone offshore Goleta.
Platform Grace Decommissioning Preparation
Beacon West Energy Group is immensely proud of its role in providing engineering support during the preparation of decommissioning Platform Grace.
ConocoPhillips Decommissioning Study
Beacon West conducted a fast-paced facility evaluation and strategic plan for the decommissioning of the Carpinteria Offshore field wells, platforms, pipelines, and onshore facilities.
Solar Powered Lighting & Surveillance System
Installation of 1.77 kW solar powered battery system providing lights, internet communications, and platform security systems.
Platform Holly Module Installations
Beacon West’s detailed engineering, project management, hazards analysis, contingency planning and construction management resulted in a safe, successful installation.
Offshore Crane Replacements
Beacon West conducted an engineering review and load capacity analysis, and managed the removal of two Unit 500 cranes from each platform for refurbishment.
Well Plugging & Abandonment Planning
In preparation for a 70-well offshore P&A campaign, Beacon West performed a comprehensive review of available well records and developed a program for monitoring annulus pressures while preparing procedures for well plugging and abandonment.
Well Plugging & Abandonment Execution
Beacon West’s well engineers and Well Site Managers perform all aspects of abandonment execution for various clients, both on and offshore.
Idle Well Management Program and CalGEM Compliance
Beacon West helps oil and gas operators stay compliant with regulatory changes through preparation of regulatory compliance plans, inspection and maintenance, and training programs.
Former Venoco Line 96 Abandonment Project
Beacon West is preparing for the permanent abandonment of the 9-mile oil pipeline, that crosses Highway 101 and runs along Calle Real from Goleta to the Gaviota coast.
Carpinteria Pipeline System De-Inventory and Abandonment Project
Beacon West operations and engineering personnel managed the flushing of a segment of the Carpinteria Pipeline System.
Platform Holly Clear Deck Project
The Beacon West engineering and operations team developed detailed agency-approved procedures and routinely perform maintenance pigging of the Platform Holly to shore pipelines. .
Legacy Well Re-Abandonment Permitting & Mitigation Monitoring
Beacon West provides CEQA, Permitting, Compliance, and Safety support for legacy well re-abandonments offshore Summerland, CA.
Santa Barbara County Toro Canyon Seep Solution Engineering Study
Beacon West developed short and long-term solutions to manage a seep in Toro Canyon.
Hazardous Materials / Waste Management Permitting & Compliance
Beacon West personnel conduct ongoing waste management compliance to property handle and dispose of operations non-hazardous, recyclable, universal and hazardous wastes, and offsite transportation and disposal of waste streams generated at onshore and offshore facilities.
Goleta Water District - Corona Del Mar Reservoir THM Project
Beacon West personnel performed electrical and instrumentation (E&I) engineering design and E&I construction observation services for this reservoir trihalomethanes (THM) removal and booster pump facility.
Platform Automation - SCADA System Modifications and PLC Management
Beacon West Instrumentation and Automation Specialists developed breathing air monitoring systems for multiple platforms in the Santa Barbara Channel to allow for the safe operation of standby air volume.