CalGEM Cost Estimates for Well Abandonment and Facility Decommissioning
Beacon West helps oil & gas operators prepare CalGEM decommissioning cost estimates for the plugging & abandonment of all wells, decommissioning of production facilities, and site remediation.
Preparing Offshore Platforms for Decommissioning
Beacon West’s rigorous planning, cross-disciplinary engineering, HSE, and field execution expertise offer safe, compliant, and cost-effective solutions tailored to each platform’s condition and configuration.
Carpinteria Pipeline System Abandonment
Beacon West recently completed final abandonment work on the Carpinteria Pipeline System from the Carpinteria Processing Facility to La Conchita.
Milestone Achieved: Platform Holly “Hardening”
Beacon West is proud to share that Platform Holly has reached a major milestone – the “hardening” (or cold stack) phase.
PRC 421 Pier & Caisson Decommissioning
Beacon West managed the removal of two 1930s vintage piers and caissons from the surf zone offshore Goleta.
Platform Grace Decommissioning Preparation
Beacon West Energy Group is immensely proud of its role in providing engineering support during the preparation of decommissioning Platform Grace.
ConocoPhillips Decommissioning Study
Beacon West conducted a fast-paced facility evaluation and strategic plan for the decommissioning of the Carpinteria Offshore field wells, platforms, pipelines, and onshore facilities.
Well Plugging & Abandonment Execution
Beacon West’s well engineers and Well Site Managers perform all aspects of abandonment execution for various clients, both on and offshore.
Carpinteria Pipeline System De-Inventory and Abandonment Project
Beacon West operations and engineering personnel managed the flushing of a segment of the Carpinteria Pipeline System.